Tel:
Ningbo Tian'an Jinghua Power Technology Co., Ltd.
Ningbo Tian'an Jinghua Power Technology Co., Ltd.

Ningbo Tian'an Jinghua Power Technology Co., Ltd.

Home ProductsLow Voltage Switchgear

GGD 3150A Low Voltage Switchgear Fixed Enclosed LV Distribution Panel GGD

GGD 3150A Low Voltage Switchgear Fixed Enclosed LV Distribution Panel GGD

  • GGD 3150A Low Voltage Switchgear Fixed Enclosed LV Distribution Panel GGD
  • GGD 3150A Low Voltage Switchgear Fixed Enclosed LV Distribution Panel GGD
GGD 3150A Low Voltage Switchgear Fixed Enclosed LV Distribution Panel GGD
Product Details:
Place of Origin: China
Brand Name: Tianan Power
Certification: ISO9001,IEC
Model Number: GGD
Payment & Shipping Terms:
Minimum Order Quantity: 10 unit
Price: Pending
Packaging Details: Wooden Case
Delivery Time: 60 work days
Payment Terms: L/C, T/T
Supply Ability: 100 sets/year
Contact Now
Detailed Product Description
Product Name: GGD Series AC Distribution Cabinet Power Switchgear Standard: IEC Standard
Type: Low Voltage,Distribution Boxes Type Color: Customer Request
Rated Frequency: 50/60Hz Surface Treatment: Hot Dip Galvanized
High Light:

GGD Low Voltage Switchgear

,

3150A Low Voltage Switchgear

,

fixed enclosed lv distribution panel GGD

GGD Series AC Distribution Cabinet Power Switchgear

 

GGD Series AC Distribution Cabinet Power Switchgear  Description

GGD type fixed enclosed low-voltage switchgear is suitable for the power station, substation, industrial and mining enterprises and other power users. AC 50/60 Hz, rated working voltage to 660V, rated working current to 3150A. As power conversion, distribution and control for power, lighting and distribution equipment in a 50kA power distribution system.

 

GGD Series AC Distribution Cabinet Power Switchgear has 129 kinds of main circuit design scheme,total 298 specifications

GGD1 49 schemes 123 specifications refer to table2

GGD2 53 schemes 107 specifications refer to table3

GGD3 27 schemes 68 specifications refer to table4

GGJ1, GGJ2 capacitance compensation switchboard is designed to meet reactive-load compensation, which has 4 main circuit schemes, total 12 specifications, refer to table 5.

 

GGD Series AC Distribution Cabinet Power Switchgear Installation and service

After the product is sent to the delivery place, it should be inspected first for its intact package and the concerning department should be informed to for its reason if any problem is found. For the product that will not be installed in time, it should be put to the suitable place according to the normal stipulation.

  • The product should be installed according to the diagram and the basic groove and bolts shall be prepared by the customer. The joint surface shall be repaired even and kept clean for the installation of busbars wiping with Vaseline or other measurement. Then, tightening shall be done by bolt.
  • After the product is installed, inspection and test shall be carried out as the following:
  1. Check if the painting of cabinet is off and its inside is dry or clean.
  2. Check the operation mechanism of electrical element is flexible or not, without block or no by too much force to operate.
  3. If the breaking of main devices are reliable or accuracy and the breaking of auxiliary contact are reliable or accuracy.
  4. If the indication of instrument, ratio and polarity of instrument transformer is correct.
  5. If the connection of busbar is good, and its insulation support , other pieces and fittings are installed well.
  6. If the auxiliary contact is conformity to the requirement and if selection of type of fuser is correct. If the set value of the relay is conformity to the requirement of design and action is accuracy.
  7. If the connection point is conformity to the requirement of electrical principle diagram.
  8. If the protection circuit system is conformity to the requirement.
  • The insulation resistance shall be not less than 1 Meg ohm by the Ohmmeter of 500V Meg ohm.
  • Notice:
  1. The product can not be installed back to the wall and can be operated in single side (front side). Only by the specialized and qualified person after the examination that operation, maintenance and inspection can be done.
  2. The resistance of air circuit breaker will be increased after closing and opening for many times due to the partial burning of main contact with charcoal occurred. So the regular maintenance and inspection shall be done according to the operation instruction.

 

Completeness of product of GGD Series AC Distribution Cabinet Power Switchgear

The following documents shall be supplied by the manufacturer during the delivery.

  1. Packing list
  2. Qualified certificate
  3. Operation instruction
  4. Test report
  5. Related electrical drawing
  6. Key, operation handles and spare parts specified by the contract

 

 

Contact Details
Ningbo Tian'an Jinghua Power Technology Co., Ltd.

Contact Person: admin

Tel: +8613858385873

Send your inquiry directly to us
Ningbo Tian'an Jinghua Power Technology Co., Ltd.
21/F, Building 1, No. 816,Jinghua Road, Hi-tech Zone,Ningbo, Zhejiang, P.R. China
Tel:86-574-87911488
Mobile Site Privacy Policy | China Good Quality High Voltage Switchgear Supplier. © 2021 - 2022 voltageswitchgear.com. All Rights Reserved.